arrow_back_ios
Go Back
Well Information
Well Name Conventional Scenario
Drilling Rig TBD 2021
Operator Company Boom 2021
Pad Name New Hope
Asset Name Legacy
Spud Date March 23, 2021, 4:07 p.m.
TD Date March 23, 2021, 4:07 p.m.
Location Title Latitude = 31.264460, Longitude = -103.084830
Well Plan

Show Plan 1

No Survey Data in System
Casing Design
Type Outer Diameter, in Inner Diameter, in Set Depth, ft Top Depth, ft
Casing 9.625 8.535 10001 0
Liner 7.625 6.878 10800 10000
Run Records
Run Number Run Type Run Description Run Date
1 Bit run Drill Pipe To Surface March 23, 2021, 4:13 p.m.
Mud Report
Density, ppg 600 RPM 300 RPM 200 RPM 100 RPM 6 RPM 3 RPM WPS OWR Date
17.00 72.0 44.0 33.0 21.0 10.0 9.0 March 23, 2021, 4:15 p.m.
17.00 80.0 56.0 45.0 33.0 13.0 12.0 March 24, 2021, 10:19 a.m.